STEP 1 — BUILD YOUR FOB COST ONLINE

Manufacturer / Supplier costing model based on the APL Excel worksheet. Enter materials, CMPT, overhead, and profit to calculate the final FOB amount.

1. ORDER INFORMATION
2. FABRICS
ItemPrice / UnitConsumption / YieldAllowance %Cost / pc
Fabric Total / pc$0.00
3. TRIMS & ACCESSORIES
ItemPrice / UnitConsumption / YieldAllowance %Cost / pc
Trims Total / pc$0.00
4. CMPT (CUT, MAKE, PACK, TRIM)
TOTAL USED CMPT / pc: $0.00
5. COST SUMMARY
CategoryTotal Amount% of Total AmountPer Piece
TOTAL RAW MATERIALS
TOTAL USED CMPT
TOTAL OVERHEAD
TOTAL PROFIT
TOTAL AMOUNT (FOB)100.00%
This online calculator follows the same core FOB costing logic as the downloadable Manufacturer / Supplier Excel worksheet. Final quotations should be reviewed against actual supplier prices and factory conditions.